Gravel Extraction – Haul Road
Gravel Extraction – Haul Road crossing point Now that the extraction has re-started the rutting of the Equestrian Centre path crossing has also started. This needs monitoring, scraping is a partial solution as well as considering a firmer base to the crossing point for the long term. A discussion is needed about the drainage ditch […]
Gravel Extraction – Haul Road Read More »

