3890/21Installation of a modular building to the North / East of plan site to enable blending of materials & manufacture, storage & distribution. Fairlop Quarry, Hainault Road, Romford2021 [28/09]
Approved 10/12/21
More
AHDA comments
2089/16/09Clause 2 of the first Schedule of the S106 Agreement: Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention & modification of plant site & ancillary facilities, the establishment of a new conveyor & haul road with restoration to agriculture & nature conservation habitats by importation of inert restoration materials.Fairlop Quarry, Hainault Road, Romford2020 [26/09]
23/06/2021 Approved
More
1613/19/01Restoration plan (Condition 3); Restoration aftercare (Condition 22): Change ofDevelopment Site North West Of School Of Riding Aldborough Hall, Aldborough Road North, Newbury Park, Ilford2020 [17/06]
27/09/2021 Approved
More
0833/20Phase F - construction of additional bunds to stock soils and overburden in support of mineral extraction operations at Fairlop Quarry as regulated by consent 2089/16.Fairlop Quarry, Hainault Road, Romford2020 [11/03]
Under assessment Expected 29/12/21
More
2089/16/07Excavation maintenance and management scheme (Condition 36); and Schedule 3 of attendant S106 Agreement: Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials.Fairlop Quarry, Hainault Road, Romford2020 [11/03]
Under assessment Expected 30 Jan 2022
More
2089/16/08LPL for both topsoil and subsoil (Condition 13 (E)): Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials.Fairlop Quarry, Hainault Road, Romford2020 [11/03]
25/03/2021 Withdrawn
More
2089/16/04Bridleway 94 temporary crossing management (Condition 65): Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials.Fairlop Quarry, Hainault Road, Romford2019 [22/01]
27/02/2019 Approved
More
1613/19Change of use to enable the establishment and use of a haul road to facilitate the recovery of sand and gravel and the importation of restoration materials from and to Phase E at Fairlop Quarry.Development Site North West Of School Of Riding Aldborough Hall, Aldborough Road North, Newbury Park, Ilford2019 [11/04]
05/06/2019 Approved with conditions
More
2089/16/06LPL for both topsoil and subsoil (Condition 13E): Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materialsFairlop Quarry, Hainault Road, Romford2019 [09/04]
08/05/2019 Approved
More
2089/16/05Contamination and long-term monitoring and maintenance plan (Condition 57 - PART ): Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials. Fairlop Quarry, Hainault Road, Romford2019 [01/02]
01/07/2019 Approved
More
2089/16/03Watercourses (Condition 4): Haul road management (Condition 49); Biosecurity protocol and Invasive Non Native Species (INNS) management plan (Condition 60): Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials.Fairlop Quarry, Hainault Road, Little Heath, Romford, Essex, RM6 5SS2018 [30/06]
04/02/2019 Approved
More
2089/16/01Details of Enclosures (Condition 5); Plant, Machinery and Equipment (Condition 7); Soil handling, management and replacement (Condition 13); Timetable of works (Condition 25); Construction logistics plan (Condition 44); Dust Management Plan (Condition 45); Noise Management Plan (Condition 47); Archaeology (Condition 50); Landscaping and earthmoving works scheme (Condition 51); Environmental Management System (Condition 62); Bicycle parking (Condition 63); Silt handling, management and placement method statement (Condition 64): Planning application for the extension of mineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials. Fairlop Quarry, Hainault Road, Romford2018 [06/06]
18/12/2018 Approved
More
2089/16/02Second Schedule of the S106 Agreement: Planning application for the extension ofmineral workings at Fairlop Quarry, into phases E and F, with establishment of new lagoon facilities, retention and modification of plant site and ancillary facilities, the establishment of a new conveyor and haul road with restoration to agriculture and nature conservation habitats by importation of inert restoration materials. Fairlop Quarry, Hainault Road, Romford2018 [06/06]
06/12/2018 Approved
More
4179/14/01Condition 42 (aftercare plan); Condition 46 (aftercare plan for wetland areas);Condition 53 (car parking): Variation of (Condition 32) of approved planning permission 2118/00 as varied by application 1620/11: The scheme for restoration shall be completed no later than 31 December 2016.Former Quarry Site D At Aldborough Hatch, Aldborough Road North, Newbury Park, Ilford2016 [15/12]
25/04/2017 Approved
More
2089/16Planning application for the extension of mineral workings at Fairlop Quarry, inFairlop Quarry, Hainault Road, Romford2016 [11/05]
05/06/2018
4179/14Variation of (Condition 32) of approved planning permission 2118/00 as varied by application 1620/11: The scheme for restoration shall be completed no later than 31 December 2016Former Quarry Site D At Aldborough Hatch, Aldborough Road North, Newbury Park, Ilford2014 [03/12]
09/02/2016 Approved with conditions
More
2673/12Variation of (Condition 2) of approved planning permission 2479/09. Extension ofFairlop Quarry, Hainault Road, Romford2013 [17/01]
13/03/2013
0027/12Variation of Conditions 27, 41, 48 and 52 of approved planning permission 2118/00. Restoration of the site from agriculture/woodland to integrated nature conservation/ amenity use; as previously varied under 3468/06.Land At Fairlop Quarry, Painters Road, Romford, Essex, RM6 5SS2012 [09/01]
28/03/2012 Approved with conditions
More
1352/12Variation of condition 8 of approved planning permission: 0027/12. Temporary relFairlop Quarry, Hainault Road, Romford2012 [06/07]
24/08/2012
1620/11Variation of (Condition 32) of approved planning permission 2118/00 as amended by planning permission 1938/08: The scheme for refilling to be completed no later than 31st December 2014Fairlop Quarry, Hainault Road, Little Heath, Romford RM6 5SS2011 [01/08]
19/12/2011 Approved with conditions
More
2479/09Placement of a static security caravan.Fairlop Quarry, Hainault Road, Little Heath, Romford, Essex, RM6 5SS2009 [08/12]
29/01/2010
1938/08Variation of condition 32 of planning permission 2118/00:Scheme for refillingLand At Painters Road, Fairlop Quarry, Chadwell Heath, Ilford, Essex, RM6 5SS2008 [30/06]
18/08/2008 Approved with conditions
More
0989/07Recycling of inert waste to produce recycled products.Fairlop Quarry, Hainault Road, Chadwell Heath, Essex2007 [05/04]
04/06/2007
3468/06Variation of conditions 27,41,48 and 52 of planning application 2118/00. tion of the site from agriculture/woodland to integrated nature conservation/amenity use.Land At Fairlop Quarry, Painters Lane, Chadwell Heath, Essex2006 [21/12]
30/03/2007 Approved with conditions
More
2230/06Recycling of inert waste to produce recycled products.Fairlop Quarry, Hainault Road, Chadwell Heath, Essex2006 [14/08]
12/10/2006
0793/85ZLAnnual agricultural aftercare report for Area A: (Condition 41).Fairlop Quarry, Hainault Road, Chadwell Heath.2005 [15/12]
30/01/2006
2118/00HAnnual agricultural aftercare report for Area D: (Condition 41). Details following
reserved matters
Aldborough Hall Farm, Aldborough Road North, Newbury Park.2005 [15/12]
30/01/2006
More
0299/03Variation to extend permission 1661/95 (condition 1 & 19) to allow storage of soils for the duration of working and restoring planning permission ref.no. 2118/00.Aldborough Hall Farm, Aldborough Road North, Newbury Park.2003 [07/02]
04/04/2003 Approved with conditions
More
0078/03Amendment to App.No.2118/00: Re-alignment of conveyor and culvert under Painters Road.Aldborough Hall Farm, Aldborough Road North, Newbury Park.2003 [20/01]
14/03/2003 Approved
More
2118/00GTimetable of works: (Condition 26) Details following reserved mattersAldborough Hall Farm, Aldborough Road North, Newbury Park.2002 [23/09]
07/11/2002 Approved
More
0793/85ZKAftercare details for Area B: (Condition B).Fairlop Quarry, Hainault Road, Chadwell Heath.2001 [15/02]
03/04/2001
1221/01Details of soil replacement. APP.No. 2121/91: Method ofFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.2001 [13/06]
05/07/2001
2118/00The extraction of approx. 912,500 tonnes of sand and gravelAldborough Hall Farm, Aldborough Road North, Newbury Park.2000 [20/09]
02/08/2001
0793/85ZISchedule of operations of Area B: (Condition 1).Fairlop Quarry, Hainault Road, Chadwell Heath.2000 [06/09]
31/10/2000
0793/85ZJDetails of aftercare including land drainage of Area A:Fairlop Quarry, Hainault Road, Chadwell Heath.2000 [06/09]
27/10/2000
0793/85ZH1999 Annual aftercare scheme:(condition 42).Fairlop Quarry, Hainault Road, Chadwell Heath.1999 [23/09]
24/11/1999
0793/85ZG1998 Annual aftercare scheme (condition 42).Fairlop Quarry, Hainault Road, Chadwell Heath.1998 [22/10]
29/11/1999
0793/85ZF1997 Annual aftercare scheme (condition 42).Fairlop Quarry, Hainault Road, Chadwell Heath.1997 [16/06]
08/10/1997
1780/96Erection of soft sand plant.Fairlop Quarry, Hainault Road, Chadwell Heath.1996 [19/11]
09/05/1997
0793/85ZE1996 Annual aftercare scheme - land drainage system - Area BFairlop Quarry, Hainault Road, Chadwell Heath.1996 [17/09]
26/02/1997
0793/85ZD1996 Annual Aftercare Scheme (condition 42).Fairlop Quarry, Hainault Road, Chadwell Heath.1996 [13/06]
19/09/1996
1793/95AMENDMENT TO APP.NOS.793/85 AND 2121/91:Revision to methodFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1995 [22/11]
31/05/1996
1661/95Extraction of approximately 925,000 tonnes of sand andHainault Farm, Hainault Road, Chadwell Heath.1995 [19/10]
29/03/1996
0793/85ZC1995 Annual Aftercare Scheme (condition 42).Fairlop Quarry, Hainault Road, Chadwell Heath.1995 [16/05]
14/11/1995
2121/91FRevised siting and design of wheel washing facility.Fairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1995 [08/06]
07/07/1995
0793/85ZAPlant site:-1.Revised position of clerk of works officeFairlop Quarry, Hainault Road, Little Heath.1994 [24/03]
28/04/1994
0793/85ZBAftercare scheme cells 1,2,3 & 4 March 1994 (condition 42).Fairlop Quarry, Hainault Road, Chadwell Heath.1994 [05/05]
08/06/1994
0610/93Amendment to APP.NO.2121/91:Revised design of bridge overFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [29/04]
14/09/1993
2121/91ABridge materials (condition 2).Fairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [23/03]
27/04/1993
2121/91BSiting, design and external appearance of office building,Fairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [23/03]
13/07/1993
2121/91CMethod of silt management (condition 7).Fairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [23/03]
06/07/1993
2121/91DLPL for topsoil and subsoil on each major soil typeFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [23/03]
28/04/1993
2121/91ERevised siting design & external appearance of officeFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [22/11]
10/03/1994
1025/93Amendment to APP.NOS.793/85 and 2121/91:Revision of methodFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1993 [07/07]
13/05/1994
0793/85KAftercare scheme (condition 42): cells 1,2,3&4 March 1993Fairlop Quarry, Hainault Road, Little Heath.1993 [01/04]
09/05/1994
0140/93Variation of conditions attached to permissions 588/88 andFairlop Quarry, Hainault Road, Little Heath.1993 [01/02]
26/02/1993
1510/92Amendment to APP.NO.793/85:Impervious seal around Area AFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1992 [28/09]
30/10/1992
2121/91Proposed revisions to the method of working, restoration andFairlop Quarry, Hainault Road, Little Heath, Chadwell Heath.1991 [20/12]
31/07/1992
0793/85ZAftercare scheme, Cell 1 (pt) Year 1 (condition 42).Fairlop Quarry, Hainault Road, Little Heath.1990 [11/05]
15/10/1992
PL/1074/89RET. OF ACCESS TO QUARRY & TRANSFORMER HOUSEFAIRLOP COUNTRY PARK,FOREST ROAD,HAINAULT1989 [24/05]
12/01/1990
PL/0821/89VARIATION TO CONDITION NO.1-20 METHOD OF WORKING,RESTORATION & AFTERCARE DOCUMENFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1989 [18/04]
30/06/1989
PL/0588/88VARIATIONS TO CONDITIONS ATTACHED TO PLANNING PERMISSION REF. 793/85FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1988 [15/03]
04/08/1988
PL/793/85GRAVEL EXTRACTION WITH ANCILLARY OFFICES W/SHOPS ETC.FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
08/01/1986
PL/793/85ASITE FENCING/GATES OF EXTRACTION SITE PURSUANT TO CONDT.NO.5FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
26/09/1986
PL/793/85BACCESS TO BE FORMED FROM HAINAULT RD TO P/CESSING PLANT SITEFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
07/10/1986
PL/793/85CACCESS STAFF OF PASSMORE EDWARDS MUSEUM P/SUANT-COND.36/7FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
07/10/1986
PL/793/85DEXTRACTION OF GRAVEL : LANDSCAPINGFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
25/09/1987
PL/793/85EPLANS ETC. OF P/PSED SAND & GRAVEL P/PLNT P/SUANT TO COND.2FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
07/10/1986
PL/793/85FDRAINAGE DITCH DIVERSION WORKS PURSUANT TO CONDITION NO.4FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
12/02/1987
PL/793/85GDETAILS OF READY MIX CONCRETE PLANTFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
20/02/1987
PL/793/85HDETAILS OF OFFICE BUILDING (CONDITION 2)FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
10/04/1987
PL/793/85IAGGREGATE CRUSHING FACILITY (CONDITION 2)FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
08/04/1987
PL/793/85JCRUSHER PLANT HOUSINGFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
08/04/1987
PL/793/85KAFTERCARE SCHEME COND. 42 CELLS 1,2,3, & 4FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
09/05/1984
PL/793/85WGRAVEL EXTRACTION WITH ANCILLARY OFFS. W/SHOPS & P/PLANT ETCFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
23/03/1987
PL/793/85XEXTRACTION OF GRAVEL P/SION OF ADDL. SOIL STORAGE MOUNDS ETCFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
25/09/1987
PL/793/85YAMENDMENT TO APPROVED PLANS: RELOCATION OF VEHICLE WHEELWASHFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
05/04/1988
PL/793/85ZAFTERCARE SCHEME CELL 1 (PT) YEAR CONDITION 42FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
15/10/1992
PL/793/85ZAPLANT SITE 1. REVISED POSITION OF CLERK OF WORKS OFFICE ETCFAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
28/04/1994
PL/793/85ZBAFTERCARE SCHEME CELLS 1,2,3 & 4 ETC.FAIRLOP QUARRY,HAINAULT ROAD,CHADWELL HEATH,ROMFORD1985 [01/01]
08/06/1995
PL/1510/83UTILISATION OF LAND RESTORED FROM GRAVEL WIINNING, FOR A CROSS COUNTRY, HORSE RIALDBOROUGH HALL RIDING SCH.,ALDBOROUGH ROAD NORTH,NEWBURY PARK1983 [01/01]
22/10/1984
PL/0362/69USE OF PART OF GRAVEL WORKING SITE FOR THE MANUFACTURE OF CONCRETE PRODUCTSFAIRLOP WATERS,FOREST ROAD,HAINAULT1969 [01/01]
01/01/1970
PL/ILF0622/62EXTRACTION OF SAND AND GRAVEL FROM 147 ACRESFAIRLOP PLAIN,FOREST ROAD,HAINAULT1962 [01/01]
15/07/1963
PL/IL0117/61EXTRACTION OF SAND AND GRAVEL AND RESTORATION FOR PLAYING FIELD OR OTHER GREEN BFAIRLOP WATERS,FOREST ROAD,HAINAULT1961 [16/02]
26/10/1961